The bridge project will focus on removing and installing new structural
steel bracing between the arches; repairing the arch ribs; cleaning and
painting portions of the structural steel in the superstructure; replacing
finger joints; sealing deck deflection joints; milling and grooving the
existing deck surface; conserving the existing historic bronze doors; and
installing temporary shielding for construction.
For further details regarding the reconstruction of the A. Piatt Andrew
Bridge, please click here. Once the
webpage has loaded, utilize the drop down menu and select Gloucester, then
click on project #607338. Keep checking
back to continuing to receive bridge updates as they become available.